Towers & townhomes
Condo and townhouse kitchens
- Strata alteration request prepared with you
- Elevator bookings and hallway protection
- Work inside the building’s quiet hours
- Storage planned to the centimetre
Burnaby, BC · Kitchen renovation
From a cabinet refresh to a full gut and new layout, one team designs, builds and finishes your kitchen, in condos, townhouses and houses across Burnaby.

Kitchen renovation in Burnaby
We help homeowners across Burnaby with all of their kitchen renovation needs. Some kitchens just need new doors, counters and better light. Others need to come down to the studs, with a new layout, an island where a wall used to be and storage that finally works. We plan and build both.
Every job starts with a visit and a measure, then a clear design and a written quote. Before anything is torn out, we sort the permits a Burnaby house may need, the strata approval a condo needs, and the hazardous-materials check an older home should have. Then one project lead runs the work, from demolition to the final walkthrough.
Kitchen remodeling is all we do on this site, and we do every part of it: design, cabinets, countertops, backsplash tile, flooring, lighting, fixtures and IKEA installs, with licensed plumbers and electricians coordinated for you.
What we do
Six ways we help, from a quick refresh to a complete remodel. Every one starts with a free visit and a written quote.

Down to the studs and back, with one team running every trade.
Explore
Install new, reface what you have, or paint it like new.
Explore
Quartz, granite and more, plus tile set and grouted.
Explore
Islands, open concept and layouts that finally work.
Explore
Strata approvals handled, small spaces made to work.
Explore
Assembled, hung level and fitted like a custom kitchen.
ExploreOne team
Tap a number to see what’s involved. Most kitchen remodels touch all seven, and we handle every one.
Taller uppers to the ceiling, new doors or a sprayed finish, and soft-close hardware. Kitchen Cabinets
Subway, zellige, herringbone or large-format tile, set to a planned layout. Countertops & Backsplash
Quartz, granite, laminate or wood, templated after the cabinets are level. Countertops & Backsplash
Pot lights, pendants and under-cabinet LEDs on separate switches. Full Kitchen Renovation
Prep space, seating and storage, with clearance planned on every side. Kitchen Design & Layout
Undermount sink, new faucet and appliances hooked up by licensed trades. Full Kitchen Renovation
Open concept, moved walls and a layout built around how you cook. Kitchen Design & Layout
Built for Burnaby homes
Towers and townhouses around the town centres, and older detached houses on the hills between them. Each needs its own kind of planning.
Towers & townhomes
Older Burnaby houses
Our process
Five steps, the same on every job. Everything that can be decided on paper is decided before demolition.
We come to your home, measure, and listen to what works and what doesn’t.
You get: notes, photos and a clear scope
Layout options, then cabinets, counters, tile, lighting and hardware chosen together.
You get: drawings and a written quote
City permits where needed, strata approval for condos, and a hazardous-materials check for older homes.
You get: approvals before demolition
One project lead runs demolition, trades, cabinets, counters, tile and finishing to the schedule.
You get: regular updates and a clean site
We go through every door, drawer and fixture with you and fix anything that isn’t right.
You get: a finished kitchen and care notes

Design & selections
Cabinet colour, counter veining, tile and hardware all look different in a showroom than in your kitchen at 7pm. We bring samples to you and lay them out together, so you can see how the oak sits next to the quartz and whether the brass reads warm or yellow in your light.
Why us
What you can count on, on every kitchen we build.
Scope, materials and schedule in writing before work starts, so you know exactly what you’re getting.
A single project lead runs every trade, from the first measure to the final walkthrough.
Layout, selections, permits and strata approval sorted first, so the job doesn’t stall halfway.
Elevator bookings, quiet hours and alteration requests handled as part of the job.
Hazardous-materials checks, permits and careful work in Burnaby’s post-war and 1970s houses.
Dust walls, floor protection and a tidy site at the end of every day.
Inspiration
A few looks that suit Burnaby homes, from tower condos to 1960s bungalows. Bring your own ideas too.






Where we work
We renovate kitchens in every part of Burnaby, from the Metrotown and Brentwood towers to the houses of Capitol Hill, Deer Lake and South Slope, and in the cities next door. Pick your neighbourhood to see what kitchens there usually need.
Guides
Straight answers on cost, permits and timing in Burnaby.

Guide
The seven decisions that shape your quote, and where to save.
Read the guide
Guide
When the City needs a permit, and why older homes get tested first.
Read the guide
Guide
Phase by phase, condo vs house, plus a planning checklist.
Read the guideFAQ
It depends on the scope more than the size. A cabinet refresh and new counters is a very different job from a full remodel that moves walls and plumbing. The biggest drivers are layout changes, cabinet type, counter material and, in older homes, what’s behind the walls. After a visit we give you a written quote at no cost. The cost guide explains each factor.
A refresh usually takes one to two weeks on site, a condo remodel about three to five, and a house with layout changes about six to ten. Design, approvals and cabinet lead time come first. See the timeline guide.
It depends on the work. The City of Burnaby says replacing fixtures, cabinets and flooring and interior painting don’t need a permit. Taking down or building walls is an alteration that does, and plumbing, gas or electrical changes in a house need trade permits. The permits guide covers the details.
If the renovation will disturb walls, ceilings or flooring, yes. WorkSafeBC’s regulation requires a qualified person to inspect for hazardous materials before renovation work begins, and it doesn’t set a cut-off year. Homes built before about 1990 are the most likely to have asbestos in drywall compound, ceiling texture or flooring.
Yes, a lot. We help with the strata alteration request, book elevators, protect common areas and work inside the building’s quiet hours.
Often, yes. If the boxes are solid and the layout works, refacing or painting and new counters can give you a new kitchen without starting over.
Free in-home consultation
Book a free visit and measure. You’ll get a clear written quote and one person to call from start to finish.
Monday to Saturday, 7am to 7pm